Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Akmola region
Agricultural sector
2
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Turkestan region
Agricultural sector
3
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Akmola region
Healthcare
4
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Almaty city
Healthcare
5
Construction of a heavy machinery plant in Atyrau region
Atyrau region
Mechanical engineering
6
Construction and operation of a full-cycle automobile plant for the production of vehicles
Almaty city
Mechanical engineering
7
Construction of a heat exchange equipment plant in Atyrau
Atyrau region
Mechanical engineering
8
Construction of a high-tech hydrometallurgical plant
Pavlodar region
Metallurgical industry
9
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Aktobe region
Metallurgical industry
10
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Karaganda region
Metallurgical industry
11
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
East Kazakhstan region
Metallurgical industry
12
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Pavlodar region
Metallurgical industry
13
Clinker production plant (clinker bricks) in Akmola region
Akmola region
Production of building materials
14
Road rehabilitation investment project
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
15
Construction of a factory for deep processing of chicken eggs
Akmola region
Food industry
16
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat»
Astana city
Production of building materials
17
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
18
Acquisition of high-performance computing infrastructure
Astana city
Transport, logistics, communications
19
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Turkestan region
Chemical industry
20
Construction of the Meliora by Vignette Collection hotel with a restaurant and a fitness center in Almaty
Almaty city
Tourism
21
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Mangistau region
Tourism
22
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Kyzylorda region
Chemical industry
23
Construction of a combined cycle gas plant in Zhezkazgan
Ulytau region
Energy
24
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
East Kazakhstan region
Energy
25
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Zhambyl region
Energy
26
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
North Kazakhstan region
Energy
27
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Turkestan region
Energy
28
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Mangistau region
Energy
29
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Karaganda region
Energy
30
Construction of a 340 MW renewable power plant in the Southern Zone
Turkestan region
Energy
31
Modernisation of the 220.95 MW wind farm in Akmola region
Akmola region
Energy
32
Multifunctional educational and health complex "AQUALINA RESORT"
Mangistau region
Tourism
33
Construction of a university multidisciplinary hospital with 900 beds and a clinical diagnostic center for 700 visits per shift in Shymkent
Shymkent city
Healthcare
34
Construction of a power plant based on a combined cycle gas plant with a maneuverable generation mode with a total capacity of up to 1000 MW
Turkestan region
Energy
35
Construction of private schools by Farabi International School
Interregional project
Education
36
Construction and operation of a multidisciplinary hospital in the city of Kosshy with a capacity of 1,000 visits per day
Akmola region
Healthcare
37
Modernization and reconstruction of electrical networks and equipment
Zhetysu region
Housing and communal services
38
Construction of a factory for the production of hot briquetted iron
Kostanay region
Metallurgical industry
39
Construction of a mining and processing plant at the Akmaya deposit in the Karaganda region
Karaganda region
Metallurgical industry
40
Mining and processing complex for processing of solid minerals in Pavlodar region
Pavlodar region
Metallurgical industry
41
Construction of the third border railroad crossing on the Kazakhstan-China border with access to the existing railroad section Semey-Aktogay - Ayagoz-Bakhty railroad line with dry port construction
Abay region
Transport, logistics, communications
42
Construction of a plant for the production of biaxially oriented polypropylene tape
Atyrau region
Chemical industry
43
Construction of a full-cycle biopharmaceutical complex
Almaty city
Pharmaceuticals
44
Raw gas processing works project
Atyrau region
Petrochemistry and oil refining
45
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
North Kazakhstan region
Agricultural sector
46
Modernization of the fat and oil plant of the branch of Maslo - Del LLP
Almaty city
Agricultural sector
47
Vertically integrated export-oriented meat production complex
Abay region
Agricultural sector
48
Establishment of a baby food production company KAZFOOD in the Republic of Kazakhstan
Aktobe region
Agricultural sector
49
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Astana city
Agricultural sector
50
Modernization of the existing production of Maslo - DelP etropavlovsk LLP
North Kazakhstan region
Agricultural sector
51
Expansion of TSZ LLP, with the launch of a beet processing line for 3,000 tons of beet per day, at a raw sugar processing plant
Zhambyl region
Agricultural sector
52
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Almaty region
Agricultural sector
53
Implementation of the 1st stage of the 1 GW Renewable Energy Project: 60 MW Kazatomprom SPP and 185 MW KEGOK SPP
Turkestan region
Energy
54
Reconstruction of Almaty CHP-3
Almaty city
Energy
55
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Karaganda region
Energy
56
Construction of infrastructure facilities of the National Industrial Petrochemical Technopark special Economic Zone in Atyrau region (Karabatan site). The additional power unit of the TPP is 165 MW
Atyrau region
Energy
57
Construction of a ferroalloy gas recovery power plant of the smelter No. 4 of the Aktobe Ferroalloy Plant, a branch of TNС Kazchrome JSC
Aktobe region
Energy
58
Modernization of Power Unit No. 3
Pavlodar region
Energy
59
Construction of a CHP Plant in the City of Kokshetau
Akmola region
Energy
60
A plant for the production of 110 and 220 kV voltage class power transformers in Shymkent. I queue
Shymkent city
Mechanical engineering
61
Construction of a factory for the production of hot briquetted iron
Kostanay region
Metallurgical industry
62
Construction of a plant for the production of medical devices and a warehouse for storing medical devices and medicines in the Medeu district of Almaty city
Almaty city
Manufacturing industry
63
Construction of a new chemical complex for the production of mineral fertilizers in Zhanatas
2025
Zhambyl region
Chemical industry
64
Construction of a new sulfuric acid production workshop in Taraz
2025
Zhambyl region
Chemical industry
65
Construction of woodworking production in the North Kazakhstan region
North Kazakhstan region
Production of building materials
66
Construction of the second stage of the plant for the production of precast concrete blocks
Astana city
Production of building materials
67
North Kazakhstan region
Manufacturing industry
68
Almaty region
Manufacturing industry
69
Almaty region
Manufacturing industry
70
Almaty region
Manufacturing industry
71
Gold extraction plant for processing ore from the Kuludzhun deposit with a capacity of 350 thousand tons per year in the Samar region of the East Kazakhstan region
East Kazakhstan region
Metallurgical industry
72
Construction of the first integrated gas chemical complex in the Atyrau region. Second phase (Construction of a gas separation complex)
Atyrau region
Petrochemistry and oil refining
73
Establishing a network of mid-range hotels under the IBIS brand of the Accor Group international hotel chain in the regions of Kazakhstan.
Interregional project
Tourism
74
Akmola region
Manufacturing industry
75
Shymkent city
76
Almaty city
77
Construction of the 17 km long "Bypass of the City of Rudny" road in the Kostanay region
Kostanay region
Transport, logistics, communications
78
Construction of a transport and logistics hub in the Almaty region
Almaty region
Transport, logistics, communications
79
Modernization of the "Central Asia Center" gas pipeline
Interregional project
Transport, logistics, communications
80
An investment project for the construction, expansion and acquisition of four transport and logistics centers in the Republic of Kazakhstan
Interregional project
Transport, logistics, communications
81
Construction of urban roads in Astana
Astana city
Transport, logistics, communications
82
Reconstruction of railway stations
Interregional project
Transport infrastructure
83
Providing wireless communications to 20 cities in Kazakhstan through the installation of 2,000 base stations
Interregional project
Transport, logistics, communications
84
Digitalization of gas metering
Interregional project
Transport, logistics, communications
85
Construction of the second line of the Beineu-Bozoi-Shymkent main gas pipeline
Interregional project
Transport, logistics, communications
86
Construction of the Dry Port transport and logistics complex in Kostanay
Interregional project
Transport, logistics, communications
87
Construction of the "Akashi" Data Center
Astana city
Transport, logistics, communications
88
Manufacture of electricity distribution and control apparatus
Shymkent city
Mechanical engineering
89
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Turkestan region
Transport infrastructure
90
Shymkent city
Housing and communal services
91
Akmola region
Housing and communal services
92
Construction of Coke Oven Batteries No. 8 and No. 9 and Coke Gas Cleaning System
Karaganda region
Mining and metallurgical complex and metallurgy
93
Construction of a longitudinally welded pipes plant
Mangistau region
Production of building materials
94
Construction and operation of a plant for the production of pressed aluminum alloy profiles with an annual output of 2000-6000 tons of profiles per year
Astana city
Production of building materials
95
Reconstruction and conversion of the shopping center building into a multidisciplinary hospital in Almaty
Almaty city
Healthcare
96
Kostanay region
Manufacturing industry
97
Akmola region
Agricultural sector
98
Provision of High-Speed Internet Access to Rural Settlements of the Republic of Kazakhstan
Interregional project
Information and communication
TOTAL:
0
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Borrower
Kaz Eggs LLP
Beneficiaries
Bozhko Maxim
Region
Akmola region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Indicative analysis
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Borrower
AGRIQA Asia LLP
Beneficiaries
Stybaev Serzhan
Region
Turkestan region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Borrower
RenEll Kokshetau LLP
Beneficiaries
Rönesans Holding
Region
Akmola region
Industry
Healthcare
Application status
Approved
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Borrower
Selin Invest LLP
Beneficiaries
Kapatsinskaya Yelena Igorevna
Region
Almaty city
Industry
Healthcare
Application status
Collecting documents for the stage of Indicative analysis
Construction of a heavy machinery plant in Atyrau region
Borrower
Nur Astana-2007 LLP
Beneficiaries
Balapashov Amandyk Berikovich
Region
Atyrau region
Industry
Mechanical engineering
Application status
Collection of documents for the stage Banking expertise
Construction and operation of a full-cycle automobile plant for the production of vehicles
Collection of documents for the stage of Banking expertise
Construction of a heat exchange equipment plant in Atyrau
Borrower
BUILTEX LLP
Beneficiaries
Abilakim Auez, Rakhmetzhanova Rasima
Region
Atyrau region
Industry
Mechanical engineering
Application status
Collection of documents for stage of Indicative analysis
Construction of a high-tech hydrometallurgical plant
Borrower
YERTIS HYDROMETALLURGICAL COMBINE LLP
Beneficiaries
Maaden International Investment
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Indicative analysis
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Borrower
KAZAKHSTAL LLP
Beneficiaries
Denis Leonidovich Hegai, Partner Plus Firm LLP (Founder S.V. Pavlinger)
Region
Karaganda region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
Borrower
Rich Land Int LLP
Beneficiaries
Biguzin Abdykarim Kairbekovich
Region
East Kazakhstan region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Borrower
Mineral Product International LLP
Beneficiaries
Kan Konstantin Alexandrovich, Kan Sergey Vladimirovich, Ibraeva Marina Leonidovna
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Approved
Clinker production plant (clinker bricks) in Akmola region
Collection of documents for the stage of Banking expertise
Road rehabilitation investment project
Borrower
NC «KazAutoZhol» JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Interregional project
Industry
Construction, reconstruction, repair, toll traffic and maintenance of highways
Application status
Collection of documents for the stage of Banking expertise
Construction of a factory for deep processing of chicken eggs
Borrower
Kaz Eggs LPP
Beneficiaries
Bozhko Maxim Vladimirovich
Region
Akmola region
Industry
Food industry
Application status
The Business proposal stage has been completed
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat»
Borrower
MetalFormer LLP
Beneficiaries
Saduakasov Maksat Orazkhanuly
Region
Astana city
Industry
Production of building materials
Application status
At the stage of Banking Expertise
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Borrower
NC «KazAutoZhol» JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Interregional project
Industry
Construction, reconstruction, repair, toll traffic and maintenance of highways
Application status
Collection of documents for the stage of Banking expertise
Acquisition of high-performance computing infrastructure
Borrower
National Information Technologies JSC
Beneficiaries
Government of Republic of Kazakhstan
Region
Astana city
Industry
Transport, logistics, communications
Application status
Collection of documents for the stage Banking expertise
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Borrower
Taiqonyr Qyshqyl Zauyty LLP
Beneficiaries
Artykbayev Nurlan
Region
Turkestan region
Industry
Chemical industry
Application status
Approved
Construction of the Meliora by Vignette Collection hotel with a restaurant and a fitness center in Almaty
Borrower
KIG Stroy LLP
Beneficiaries
Kasanov Murat Ziyatdinovich
Region
Almaty city
Industry
Tourism
Application status
Collection of documents for the stage Banking expertise
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Borrower
TETHYS AKTAU I LLP
Beneficiaries
mr. Fettah Tamince
Region
Mangistau region
Industry
Tourism
Application status
At the stage of Banking expertise
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Borrower
AralSoda LLP
Beneficiaries
Dauren Mukashev
Region
Kyzylorda region
Industry
Chemical industry
Application status
At the stage of Banking expertise
Construction of a combined cycle gas plant in Zhezkazgan
Borrower
Kazakhmys Energy LLP
Beneficiaries
Kim Vladimir Sergeevich, Ogai Eduard Viktorovich
Region
Ulytau region
Industry
Energy
Application status
Collecting documents for the stage Indicative analysis
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
KALZHYR RIVER ENERGY LLP
Beneficiaries
Kussainov Aigazy Amirlanovich
Region
East Kazakhstan region
Industry
Energy
Application status
Collecting documents for the stage Indicative analysis
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
Taraz Green Power Genco LLP
Beneficiaries
Boguslavsky Evgeny Lvovich, Kim Yuri Gennadievich,Dosmukhambetov Chingiz Temerkanovich
Region
Zhambyl region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
Borrower
Circular-M LLP
Beneficiaries
Tortkara Shyngyskhan
Region
North Kazakhstan region
Industry
Energy
Application status
At the stage Business offer
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Borrower
New Clean Energy LLP
Beneficiaries
Private company «South wind Ltd», beneficiary – Nakipbekov Nurzhan Nurlanovich
Region
Turkestan region
Industry
Energy
Application status
At the stage of Indicative analysis
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangistau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Collection of documents for the stage of Indicative analysis
Modernisation of the 220.95 MW wind farm in Akmola region
Borrower
Jasil Jel Energy LLP, «Borey Energo» LLP, «Energo Trust» LLP, Sofiyevskaya Wind Power Plant LLP, Arkalyk Wind Power Plant LLP
Beneficiaries
«CPIH Netherlands B.V.» company, «Sao Simao Investment Limited» company, China Power International Holding Ltd. (China) – State Power Investment Corporation Limited (beneficial shareholder of СPIH)
Region
Akmola region
Industry
Energy
Application status
Approved
Multifunctional educational and health complex "AQUALINA RESORT"
Borrower
Caspian Plaza LPP
Beneficiaries
Belovich Pavel
Region
Mangistau region
Industry
Tourism
Application status
At the stage of Indicative analysis
Construction of a university multidisciplinary hospital with 900 beds and a clinical diagnostic center for 700 visits per shift in Shymkent
Borrower
Kazakh Innovation University LLP
Beneficiaries
Seitzhanov S., Seitzhanova K., Seitzhanov B., Seitzhanova Zh., Seitzhanov B., Seitzhanov N.
Region
Shymkent city
Industry
Healthcare
Application status
At the stage of Banking expertise
Construction of a power plant based on a combined cycle gas plant with a maneuverable generation mode with a total capacity of up to 1000 MW
Borrower
PGU Turkestan LLP
Beneficiaries
Samruk-Kazyna JSC
Region
Turkestan region
Industry
Energy
Application status
Approved
Construction of private schools by Farabi International School
Collection of documents for the stage of Banking expertise
Modernization and reconstruction of electrical networks and equipment
Borrower
Taldykorgan Transport and Power Grid Join-Stock Company
Beneficiaries
Sirgebaev A.T., Aldabergenov M.A., Kozhakov K.A.
Region
Zhetysu region
Industry
Housing and communal services
Application status
Collection of documents for the stage of Banking expertise
Construction of a factory for the production of hot briquetted iron
Borrower
Private company «Ertis Hydro Ltd»
Beneficiaries
Shodiev Patokh, Ibragimova Mukadaskhan
Region
Kostanay region
Industry
Metallurgical industry
Application status
Collection of documents for the stage of Indicative analysis
Construction of a mining and processing plant at the Akmaya deposit in the Karaganda region
Borrower
Akmaya Tungsten LLP
Beneficiaries
Meirambekov Temirzhan
Region
Karaganda region
Industry
Metallurgical industry
Application status
Collection of documents for the stage of Indicative analysis
Mining and processing complex for processing of solid minerals in Pavlodar region
Borrower
Demeu Kok-Tas LLP
Beneficiaries
Ablasanov Baykadam
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Collection documents for the stage Indicative analysis
Construction of the third border railroad crossing on the Kazakhstan-China border with access to the existing railroad section Semey-Aktogay - Ayagoz-Bakhty railroad line with dry port construction
Borrower
GlobalTrans Company LLP
Beneficiaries
Pavlinger Roman
Region
Abay region
Industry
Transport, logistics, communications
Application status
Collection of documents for the stage of Indicative analysis
Construction of a plant for the production of biaxially oriented polypropylene tape
Borrower
WF Waterfall.kz LLP
Beneficiaries
Kuzin Konstantin
Region
Atyrau region
Industry
Chemical industry
Application status
Collection of documents for the stage «Indicative analysis»
Construction of a full-cycle biopharmaceutical complex
Borrower
Khan Tengri BioPharma LLP
Beneficiaries
Karimullin Askar, Amankeldy Alikhan, Ignatiev Vasily, Daeva Valeria, Kuryanova Olga
Region
Almaty city
Industry
Pharmaceuticals
Application status
Collection of documents for the stage «Indicative analysis»
Raw gas processing works project
Borrower
PolisMunaiKurylys LLP
Beneficiaries
Bilyalov Bagit
Region
Atyrau region
Industry
Petrochemistry and oil refining
Application status
Collection documents to the stage Indicative analysis
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
Borrower
Atameken-Agro Oils LLP
Beneficiaries
Amir Islamov
Region
North Kazakhstan region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Modernization of the fat and oil plant of the branch of Maslo - Del LLP
Borrower
Maslo - Del LLP
Beneficiaries
Selivanov Pavel
Region
Almaty city
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Vertically integrated export-oriented meat production complex
Borrower
Private company EMA Ltd.
Beneficiaries
Nogaev Ayukhan
Region
Abay region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Establishment of a baby food production company KAZFOOD in the Republic of Kazakhstan
Borrower
Kazfood Production LLP
Beneficiaries
Kurochkin Andrey
Region
Aktobe region
Industry
Agricultural sector
Application status
Collection documents to the stage of Banking expertise
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Borrower
Kazak Protein LLP
Beneficiaries
Ahmet Tiryakioglu, Suleiman Tiryakioglu
Region
Astana city
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Modernization of the existing production of Maslo - DelP etropavlovsk LLP
Borrower
Maslo - Del Petropavlovsk LLP
Beneficiaries
Selivanov Pavel
Region
North Kazakhstan region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Expansion of TSZ LLP, with the launch of a beet processing line for 3,000 tons of beet per day, at a raw sugar processing plant
Borrower
TSZ LLP
Beneficiaries
Demidov Pavel, Demidova Svetlana
Region
Zhambyl region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Indicative analysis
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Borrower
Alatau Green Production LLP
Beneficiaries
Firuza Perzadayeva, Vagiz Iskanov
Region
Almaty region
Industry
Agricultural sector
Application status
Approved
Implementation of the 1st stage of the 1 GW Renewable Energy Project: 60 MW Kazatomprom SPP and 185 MW KEGOK SPP
Borrower
Altyn Dala Energy Ltd. Private company
Beneficiaries
Dzhaparov Ulan, Samruk-Energo JSC
Region
Turkestan region
Industry
Energy
Application status
At the stage of Banking expertise
Reconstruction of Almaty CHP-3
Borrower
Almaty electric stations JSC
Beneficiaries
State Institution "State Property and Privatization Committee of the Ministry of Finance of the Republic of Kazakhstan"
Region
Almaty city
Industry
Energy
Application status
Approved by the Board of Directors
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Borrower
KAZ GREEN ENERGY LLP
Beneficiaries
Vladimir Sergeevich Kim, Eduard Viktorovich Ogai Vladimir Viktorovich Jumanbayev
Region
Karaganda region
Industry
Energy
Application status
Approved by the Board
Construction of infrastructure facilities of the National Industrial Petrochemical Technopark special Economic Zone in Atyrau region (Karabatan site). The additional power unit of the TPP is 165 MW
Borrower
Karabatan Utility Solutions LLP
Beneficiaries
NWF Samruk-Kazyna JSC
Region
Atyrau region
Industry
Energy
Application status
Collecting documents for the stage of Indicative analysis
Construction of a ferroalloy gas recovery power plant of the smelter No. 4 of the Aktobe Ferroalloy Plant, a branch of TNС Kazchrome JSC
Borrower
JSC "Multinational Company "Kazchrome
Beneficiaries
Successor of Mashkevich Alexander, Shodiev Patok, Ibragimova Mukadashan
Region
Aktobe region
Industry
Energy
Application status
At the stage of Indicative analysis
Modernization of Power Unit No. 3
Borrower
LLP Ekibastuz GRES-1 named after Bulat Nurzhanov
Beneficiaries
NWF Samruk-Kazyna JSC
Region
Pavlodar region
Industry
Energy
Application status
Collecting documents for the stage of Indicative analysis
Construction of a CHP Plant in the City of Kokshetau
Borrower
LLP "Kokshetau CHP"
Beneficiaries
NWF Samruk-Kazyna JSC
Region
Akmola region
Industry
Energy
Application status
Collecting documents for the stage of Indicative analysis
A plant for the production of 110 and 220 kV voltage class power transformers in Shymkent. I queue
Borrower
Asia Trafo LLP
Beneficiaries
Kozhabaev Saidulla, Ilyasov Sultan
Region
Shymkent city
Industry
Mechanical engineering
Application status
Collection documents for the stage of Indicative analysis
Construction of a factory for the production of hot briquetted iron
Borrower
QazIron ERG LLP
Beneficiaries
Ibragimova Mukadaskhan, Shodiev Patokh, Heir of Alexander Mashkevich
Region
Kostanay region
Industry
Metallurgical industry
Application status
Collection documents for the stage of Indicative analysis
Construction of a plant for the production of medical devices and a warehouse for storing medical devices and medicines in the Medeu district of Almaty city
Borrower
LLP "KYZAI"
Beneficiaries
Kamalbek Bauyrzhan Dalelkhanuly
Region
Almaty city
Industry
Manufacturing industry
Application status
Collection of documents for Stage 3 – "Bank Examination" (Stage 2 approved by Decision No. 1/25 dated August 8, 2025)
Construction of a new chemical complex for the production of mineral fertilizers in Zhanatas
Borrower
LLP "ZHANATAS CHEMICAL COMPLEX"
Beneficiaries
Kim Vladimir Sergeevich, Ogay Eduard Viktorovich, Nurlanov Nurkhan Nurlanovich, Nurlanov Nurzhan Nurlanovich, Ogai Eduard Viktorovich, Genkin Mikhail Vladimirovich, Momtsemlidze Sergey Raulievich, Shchavel Evgeny Gennadievich
Region
Zhambyl region
Industry
Chemical industry
Application status
approved at the first stage of banking examination Project "Business Proposal"
Construction of a new sulfuric acid production workshop in Taraz
Borrower
ТОО "TARAZ SULPHURIC ACID PLANT"
Beneficiaries
Kim Vladimir Sergeevich, Ogay Eduard Viktorovich, Nurlanov Nurkhan Nurlanovich, Nurlanov Nurzhan Nurlanovich, Ogai Eduard Viktorovich, Genkin Mikhail Vladimirovich, Momtsemlidze Sergey Raulievich, Shchavel Evgeny Gennadievich
Region
Zhambyl region
Industry
Chemical industry
Application status
approved at the first stage of banking examination Project "Business Proposal"
Construction of woodworking production in the North Kazakhstan region
Borrower
Ultradecor Trading Kazakhstan LLP
Beneficiaries
Causa Holding LLC, Causa F SPC LLC
Region
North Kazakhstan region
Industry
Production of building materials
Application status
At the stage of "Indicative analysis"
Construction of the second stage of the plant for the production of precast concrete blocks
Borrower
«ModeX Astana» LLP
Beneficiaries
«BI Development Astana» LLP -100%
Region
Astana city
Industry
Production of building materials
Application status
Collection of documents for the «Banking examination» stage
Borrower
Beneficiaries
Region
North Kazakhstan region
Industry
Manufacturing industry
Application status
Borrower
Beneficiaries
Region
Almaty region
Industry
Manufacturing industry
Application status
Borrower
Beneficiaries
Region
Almaty region
Industry
Manufacturing industry
Application status
Borrower
Beneficiaries
Region
Almaty region
Industry
Manufacturing industry
Application status
Gold extraction plant for processing ore from the Kuludzhun deposit with a capacity of 350 thousand tons per year in the Samar region of the East Kazakhstan region
Collection of documents for Stage 3 "Banking Expertise"
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Borrower
South Hydro Power LLP
Beneficiaries
Ontustik Financial Commercial and Industrial Corporation LLP (Seitzhanov family), EAST INDUSTRY COMPANY Ltd LLP (Bazarbekuly Baglan and Kozhabekov Nurlan Bazarbekovich)
Region
Turkestan region
Industry
Transport infrastructure
Application status
Collection of documents for the stage Banking expertise
Borrower
Beneficiaries
Region
Shymkent city
Industry
Housing and communal services
Application status
Borrower
Beneficiaries
Region
Akmola region
Industry
Housing and communal services
Application status
Construction of Coke Oven Batteries No. 8 and No. 9 and Coke Gas Cleaning System
Borrower
«Qarmet» JSC
Beneficiaries
A.S. Lavrentyev
Region
Karaganda region
Industry
Mining and metallurgical complex and metallurgy
Application status
Approved
Construction of a longitudinally welded pipes plant
Collection of documents for the «Banking examination» stage
Construction and operation of a plant for the production of pressed aluminum alloy profiles with an annual output of 2000-6000 tons of profiles per year
Borrower
Luxal Aluminum Profile Factory LLP
Beneficiaries
Kushnir Tatyana
Region
Astana city
Industry
Production of building materials
Application status
Collection of documents for the «Banking examination» stage
Reconstruction and conversion of the shopping center building into a multidisciplinary hospital in Almaty
Borrower
Orhun Medical LLP
Beneficiaries
Kasanov Murat, Diric Genench Nihat, PC CHEVRON Direct Investment Fund
Region
Almaty city
Industry
Healthcare
Application status
Collecting documents for the stage of Indicative analysis
Borrower
Beneficiaries
Region
Kostanay region
Industry
Manufacturing industry
Application status
Borrower
Beneficiaries
Region
Akmola region
Industry
Agricultural sector
Application status
Provision of High-Speed Internet Access to Rural Settlements of the Republic of Kazakhstan
Borrower
JSC "Kazakhtelecom"
Beneficiaries
JSC "Samruk-Kazyna National Welfare Fund"
Region
Interregional project
Industry
Information and communication
Application status
Collection of documents for Stage 3 "Banking Expertise"
№
Name of the Project/Operation
Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Pre-export financing
Karaganda region
Comprehensive maintenance of facilities
11,660
2
Pre-export financing
West Kazakhstan region
Agricultural sector
1000
3
Pre-export financing
West Kazakhstan region
Agricultural sector
3000
4
Pre-export financing
Almaty region
Agricultural sector
1500
5
Pre-export financing
East Kazakhstan region
Mechanical engineering
4000
6
Pre-export financing
Turkestan region
Manufacturing industry
1000
7
Pre-export financing
Shymkent city
Manufacturing industry
13000
8
Pre-export financing
Akmola region
Manufacturing industry
1500
9
Pre-export financing
Shymkent city
Manufacturing industry
1600
10
Pre-export financing
Pavlodar region
Metallurgical industry
68000
11
Pre-export financing
Zhambyl region
Manufacturing industry
7000
12
Pre-export financing
Shymkent city
Manufacturing industry
6000
13
Pre-export financing
Almaty region
Manufacturing industry
2160
14
Pre-export financing
Zhetysu region
Manufacturing industry
2500
15
Pre-export financing
Kyzylorda region
Manufacturing industry
1000
16
Pre-export financing
Zhetysu region
Food industry
5000
17
Pre-export financing
Almaty region
Food industry
5000
18
Pre-export financing
West Kazakhstan region
Food industry
1000
19
Pre-export financing
Kostanay region
Food industry
2000
20
Pre-export financing
Zhambyl region
Chemical industry
50,000
21
Almaty city
Food industry
TOTAL:
126 321
Pre-export financing
Borrower
Technogruppservice LLP
Beneficiaries
Abenov Kanat
Region
Karaganda region
Industry
Comprehensive maintenance of facilities
Application status
Collection of documents for the stage Banking expertise