Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Atyrau region
Petrochemistry and oil refining
2
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Mangystau region
Tourism
3
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Shymkent
Medicine
4
Organization of the Atyrau Carriage Building Company's activities for the production of freight railcars
Atyrau region
Mechanical engineering
5
Construction of the highway «Rudny city bypass» in Kostanay region, length of 17 km
Kostanay region
Construction, reconstruction, repair, toll traffic and maintenance of highways
6
Construction of an international hospital with 200 beds in Almaty
Almaty
Healthcare
7
Construction of a 340 MW renewable power plant in the Southern Zone
Turkistan region
Energy
8
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Zhambyl region
Chemical industry
9
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Turkistan region
Energy
10
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Karaganda region
Metallurgical industry
11
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
East Kazakhstan region
Metallurgical industry
12
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Aktobe region
Metallurgical industry
13
Modernisation of the 220.95 MW wind farm in Akmola region
Akmola region
Energy
14
Construction of the Balkhash solar power plant with a capacity of 30 MW
Karaganda region
Energy
15
Industrial development of polymetallic ores of the Shalkiya deposit in the Kyzylorda region with the construction of an enrichment plant
Kyzylorda region
Metallurgical industry
16
Construction of a high-tech hydrometallurgical plant
Pavlodar region
Metallurgical industry
17
Construction of a longitudinally welded pipes plant
Mangystau region
Manufacture of construction materials
18
Construction of a heavy machinery plant in Atyrau region
Atyrau region
Mechanical engineering
19
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Karaganda region
Energy
20
Construction of the Merke HPS cascade-5,6,7
Zhambyl region
Energy
21
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Almaty
Healthcare
22
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Akmola region
Healthcare
23
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Zhambyl region
Chemical industry
24
Organization of the Atyrau Carriage Building Company's activities for the production of freight railcars
Atyrau region
Mechanical engineering
25
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Turkistan region
Transport infrastructure
26
Comprehensive reconstruction of Karaganda International Airport
Karaganda region
Transport infrastructure
27
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
28
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Mangystau region
Energy
29
Modernization of boiler unit No. 7 CHPP-1 (using natural gas as fuel)
Mangystau region
Energy
30
Construction of the 50 MW Sarkylmas Kuat wind farm
Mangystau region
Energy
31
Construction of a plant for the production of glass containers in Kyzylorda
Kyzylorda region
Manufacture of construction materials
32
Plant for the production of ceramic products in Karaganda, Karaganda region
Karaganda region
Manufacture of construction materials
33
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Almaty region
Manufacture of construction materials
34
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
North Kazakhstan region
Energy
35
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Zhambyl region
Energy
36
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
East Kazakhstan region
Energy
37
Construction of a combined cycle gas plant in Zhezkazgan
East Kazakhstan region
Energy
38
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Turkistan region
Energy
39
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Kyzylorda region
Chemical industry
40
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Pavlodar region
Metallurgical industry
41
Organization of activities of the VISTA LAGO recreational complex on Lake Sadyrkol
East Kazakhstan region
Tourism
42
Educational and wellness center
Mangystau region
Tourism
43
Construction of a factory for deep processing of chicken eggs
Akmola region
Food industry
44
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Turkistan region
Tourism
45
Construction of the Hilton hotel in Almaty
Almaty
Tourism
46
Construction of the Meliora by Vignette Collection hotel with a restaurant and a fitness center in Almaty
Almaty
Tourism
47
Road rehabilitation investment project
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
48
Construction and operation of a full-cycle automobile plant for the production of vehicles
Almaty
Mechanical engineering
49
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat»
Astana
Manufacture of construction materials
50
Construction of a longitudinally welded pipes plant
Astana
Manufacture of construction materials
51
Construction of woodworking production in the North Kazakhstan region
North Kazakhstan region
Manufacture of construction materials
52
Construction of the Caspian Pipe Plant in the Mangistau region
Mangystau region
Manufacture of construction materials
53
A plant for the production of 110 and 220 kV voltage class power transformers in Shymkent. I queue
Shymkent
Mechanical engineering
54
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Turkistan region
Chemical industry
55
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
North Kazakhstan region
Agricultural sector
56
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Turkistan region
Agricultural sector
57
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Almaty region
Agricultural sector
58
Vertically integrated export-oriented meat production complex
Abay region
Agricultural sector
59
Establishment of a baby food production company KAZFOOD in the Republic of Kazakhstan
Aktobe region
Food industry
60
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Astana
Agricultural sector
61
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Akmola region
Agricultural sector
62
Construction of a fruit processing plant
Almaty region
Agricultural sector
63
Closed-cycle poultry complex for the production and processing of broiler meat (3rd stage)
Almaty region
Agricultural sector
64
Development of an oil and gas field and construction of a gas processing plant
Atyrau region
Petrochemistry and oil refining
65
Construction of an polyethylene production plant
Atyrau region
Petrochemistry and oil refining
66
Copper mining and production at the Tesiktas deposit
Karaganda region
Metallurgical industry
67
Reconstruction of the Balkhash zinc plant for processing substandard copper concentrates
Karaganda region
Metallurgical industry
68
Export operation
The Republic of Uzbekistan
The financial sector
69
Reconstruction of Almaty CHP-3
Almaty
Energy
70
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Karaganda region
Energy
71
Construction of the Eskeldinskaya HPP cascade with an installed capacity of 23.2 MW
Zhetysu region
Energy
72
Implementation of the 1st stage of the 1 GW Renewable Energy Project: 60 MW Kazatomprom SPP and 185 MW KEGOK SPP
Turkistan region
Energy
73
Construction of Lepsy hydroelectric power station of 15 MW
Zhetysu region
Energy
TOTAL:
198 460
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Borrower
GPC Investment LLP
Beneficiaries
SI Committee of State Property and Privatization under the Ministry of Finance of the Republic
Region
Atyrau region
Industry
Petrochemistry and oil refining
Application status
Approved
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Borrower
TETHYS AKTAU I LLP
Beneficiaries
mr. Fettah Tamince
Region
Mangystau region
Industry
Tourism
Application status
At the stage of Banking expertise
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Collection of documents for the stage of Indicative analysis
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Borrower
ASIACHEM LLP
Beneficiaries
Kanat Kairzhanovich Kanafin
Region
Zhambyl region
Industry
Chemical industry
Application status
Collection of documents for the stage «Banking expertise»
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Borrower
CCP Turkestan LLP
Beneficiaries
Samruk-Kazyna NWF JSC
Region
Turkistan region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Borrower
KAZAKHSTAL LLP
Beneficiaries
Denis Leonidovich Hegai, Partner Plus Firm LLP (Founder S.V. Pavlinger)
Region
Karaganda region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
Borrower
Rich Land Int LLP
Beneficiaries
Biguzin Abdykarim Kairbekovich
Region
East Kazakhstan region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Modernisation of the 220.95 MW wind farm in Akmola region
Borrower
Jasil Jel Energy LLP, «Borey Energo» LLP, «Energo Trust» LLP, Sofiyevskaya Wind Power Plant LLP, Arkalyk Wind Power Plant LLP
Beneficiaries
«CPIH Netherlands B.V.» company, «Sao Simao Investment Limited» company, China Power International Holding Ltd. (China) – State Power Investment Corporation Limited (beneficial shareholder of СPIH)
Region
Akmola region
Industry
Energy
Application status
Approved
Construction of the Balkhash solar power plant with a capacity of 30 MW
Borrower
AA SOLAR LLP
Beneficiaries
Ogai Eduard Viktorovich, Dzhumanbayev Vladimir Viktorovich
Region
Karaganda region
Industry
Energy
Application status
At the stage of Indicative analysis
Industrial development of polymetallic ores of the Shalkiya deposit in the Kyzylorda region with the construction of an enrichment plant
Borrower
ShalkiyaZinc LTD JSC
Beneficiaries
National mining company «Tau-Ken Samruk»
Region
Kyzylorda region
Industry
Metallurgical industry
Application status
At the stage «Indicative analysis»
Construction of a high-tech hydrometallurgical plant
Borrower
YERTIS HYDROMETALLURGICAL COMBINE LLP
Beneficiaries
Maaden International Investment
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Indicative analysis
Construction of a longitudinally welded pipes plant
Collection of documents for stage of Banking expertise
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Borrower
Ocean Energy Company LLP
Beneficiaries
Ontustik Financial Commercial and Industrial Corporation LLP (Seitzhanov family), EAST INDUSTRY COMPANY Ltd LLP (Bazarbekuly Baglan and Kozhabekov Nurlan Bazarbekovich)
Region
Turkistan region
Industry
Transport infrastructure
Application status
Collection of documents for the stage Banking expertise
Comprehensive reconstruction of Karaganda International Airport
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Borrower
NC «KazAutoZhol» JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Interregional project
Industry
Construction, reconstruction, repair, toll traffic and maintenance of highways
Application status
Collection of documents for the stage of Banking expertise
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangystau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Modernization of boiler unit No. 7 CHPP-1 (using natural gas as fuel)
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangystau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Construction of the 50 MW Sarkylmas Kuat wind farm
Borrower
Sarkylmas Kuat LLP
Beneficiaries
Nan Yi, Kozhasbai Yerlan Saduakasuly, Zhandosov Oraz Alievich, Nan Haoren, Nan Cunfei
Region
Mangystau region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of a plant for the production of glass containers in Kyzylorda
Borrower
Seven Rivers Technologies LLP
Beneficiaries
Khatim Daniyar, Umbetayev Anuar Saktaganovich, Schneider Andreas
Region
Kyzylorda region
Industry
Manufacture of construction materials
Application status
At the stage of Indicative Analysis
Plant for the production of ceramic products in Karaganda, Karaganda region
Borrower
QAZCLINKER LLP
Beneficiaries
Smagulov Daulet Smagulovich
Region
Karaganda region
Industry
Manufacture of construction materials
Application status
At the stage of Banking expertise
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Borrower
«Altyn Taga» LLP
Beneficiaries
Orynbayev Miras Bakytovich
Region
Almaty region
Industry
Manufacture of construction materials
Application status
Approved
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
Borrower
Circular-M LLP
Beneficiaries
Abdymazhitova Ekaterina Alekseevna
Region
North Kazakhstan region
Industry
Energy
Application status
Collecting documents for the stage Indicative analysis
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
Taraz Green Power Genco LLP
Beneficiaries
Boguslavsky Evgeny Lvovich, Kim Yuri Gennadievich,Dosmukhambetov Chingiz Temerkanovich
Region
Zhambyl region
Industry
Energy
Application status
Collecting documents for the stage Banking expertise
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
KALZHYR RIVER ENERGY LLP
Beneficiaries
Kussainov Aigazy Amirlanovich
Region
East Kazakhstan region
Industry
Energy
Application status
Collecting documents for the stage Banking expertise
Construction of a combined cycle gas plant in Zhezkazgan
Borrower
Kazakhmys Energy LLP
Beneficiaries
Kim Vladimir Sergeevich, Ogai Eduard Viktorovich
Region
East Kazakhstan region
Industry
Energy
Application status
Collecting documents for the stage Banking expertise
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Borrower
New Clean Energy LLP
Beneficiaries
Private company «South wind Ltd», beneficiary – Nakipbekov Nurzhan Nurlanovich
Region
Turkistan region
Industry
Energy
Application status
Collection of documents for the stage Banking expertise
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Borrower
AralSoda LLP
Beneficiaries
Dauren Mukashev
Region
Kyzylorda region
Industry
Chemical industry
Application status
At the stage of Banking expertise
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Borrower
Mineral Product International LLP
Beneficiaries
Kan Konstantin Alexandrovich, Kan Sergey Vladimirovich, Ibraeva Marina Leonidovna
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Approved
Organization of activities of the VISTA LAGO recreational complex on Lake Sadyrkol
Borrower
VISTA LAGO LPP
Beneficiaries
Shakenova Zhanna Myrzakhanovna
Region
East Kazakhstan region
Industry
Tourism
Application status
Collection documents for the stage Indicative analysis
Educational and wellness center
Borrower
Caspian Plaza LPP
Beneficiaries
Belovich Pavel Alexandrovich
Region
Mangystau region
Industry
Tourism
Application status
Collection documents for the stage Indicative analysis
Construction of a factory for deep processing of chicken eggs
Borrower
Kaz Eggs LPP
Beneficiaries
Bozhko Maxim Vladimirovich
Region
Akmola region
Industry
Food industry
Application status
The Business proposal stage has been completed
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Collection of documents for the stage of Banking expertise
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat»
Borrower
MetalFormer LLP
Beneficiaries
Saduakasov Maksat Orazkhanuly
Region
Astana
Industry
Manufacture of construction materials
Application status
At the stage of Banking Expertise
Construction of a longitudinally welded pipes plant
Borrower
BERTYS MACHINERY LLP
Beneficiaries
Almurat Kalybaev
Region
Astana
Industry
Manufacture of construction materials
Application status
Аpproved
Construction of woodworking production in the North Kazakhstan region
Borrower
Ultradecor Trading Kazakhstan LLP
Beneficiaries
Causa Holding LLC, Causa F SPC LLC
Region
North Kazakhstan region
Industry
Manufacture of construction materials
Application status
Collection of documents for the stage Indicative analysis
Construction of the Caspian Pipe Plant in the Mangistau region
Borrower
Caspian Pipe Plant LLP
Beneficiaries
Aryngazin Alibek, Aryngazin Ruslan
Region
Mangystau region
Industry
Manufacture of construction materials
Application status
At the stage of Indicative analysis
A plant for the production of 110 and 220 kV voltage class power transformers in Shymkent. I queue
Borrower
Asia Trafo LLP
Beneficiaries
Kozhabaev Saidulla, Ilyasov Sultan
Region
Shymkent
Industry
Mechanical engineering
Application status
Collection documents for the stage of Indicative analysis
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Borrower
Taiqonyr Qyshqyl Zauyty LLP
Beneficiaries
Artykbayev Nurlan
Region
Turkistan region
Industry
Chemical industry
Application status
Approved
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
Borrower
Atameken-Agro Oils LLP
Beneficiaries
Amir Islamov
Region
North Kazakhstan region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Borrower
AGRIQA Asia LLP
Beneficiaries
Stybaev Serzhan
Region
Turkistan region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Borrower
Alatau Green Production LLP
Beneficiaries
Firuza Perzadayeva
Region
Almaty region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Vertically integrated export-oriented meat production complex
Borrower
Private company EMA Ltd.
Beneficiaries
Nogaev Ayukhan
Region
Abay region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Establishment of a baby food production company KAZFOOD in the Republic of Kazakhstan
Borrower
Kazfood Production LLP
Beneficiaries
Kurochkin Andrey
Region
Aktobe region
Industry
Food industry
Application status
At the stage of Indicative analysis
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Borrower
Kazak Protein LLP
Beneficiaries
Ahmet Tiryakioglu, Suleiman Tiryakioglu
Region
Astana
Industry
Agricultural sector
Application status
Collecting documents for the stage Indicative analysis
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Borrower
Kaz Eggs LLP
Beneficiaries
Bozhko Maxim
Region
Akmola region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Indicative analysis
Construction of a fruit processing plant
Borrower
Qazaq Global Food JV LLP
Beneficiaries
Doszhanov Ergali
Region
Almaty region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Closed-cycle poultry complex for the production and processing of broiler meat (3rd stage)
Borrower
Prima Kus LLP
Beneficiaries
Garber Alexander
Region
Almaty region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Development of an oil and gas field and construction of a gas processing plant