Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Construction of a poultry farm with a capacity of 12,500 tons of poultry meat per year in Zerendinsky district of Akmola region of the Republic of Kazakhstan
Akmola region
Agricultural sector
2
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Zhambyl region
Chemical industry
3
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Kyzylorda region
Chemical industry
4
Expansion of production capacity to increase new production lines and replenish working capital for pre-export financing
Almaty region
Food industry
5
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
North Kazakhstan region
Food industry
6
Vertically Integrated Poultry Farm for Broiler Meat Production, With a Capacity of 24,000 Tons Per Year, in the West Kazakhstan Region
West Kazakhstan region
Food industry
7
Agro-Industrial Complex for Beef Production in Akmola Region
Akmola region
Agricultural sector
8
Construction of Meat Processing Complex in Abai Region of the Republic of Kazakhstan, Semipalatinsk Meat Canning Plant
Abay region
Agricultural sector
9
Forming of Dairy Farms for 1,200 heads in Kostanay Region
Kostanay region
Agricultural sector
10
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Atyrau region
Petrochemistry and oil refining
11
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Mangystau region
Tourism
12
Construction of a 150 MW Wind Farm (Khromtau-1) in Aktobe Region
Construction of a production complex for the production of pumping equipment, pipeline fittings and asynchronous electric motors in the free economic zone «G4City», Konaev, Almaty region
Almaty region
Mechanical engineering
15
Tourist base «Ski & Spa Resort»
Almaty
Tourism
16
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Pavlodar region
Metallurgical industry
17
Expansion of the mining and processing plant for the production of copper and nickel concentrates at the Maksut deposit of the company BAST JSC
Abay region
Metallurgical industry
18
Construction of a new gas processing plant
Mangystau region
Petrochemistry and oil refining
19
Organization of production of metallic silicon
Ulytau region
Metallurgical industry
20
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
East Kazakhstan region
Metallurgical industry
21
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Turkistan region
Energy
22
Reconstruction of Almaty CHP-3
Almaty
Energy
23
Strengthening the electrical network of the Southern zone of the UES of Kazakhstan. Construction of electrical grid facilities
Interregional project
Energy
24
Creation of a World-Class Innovative Entrepreneurial University in PIT Alatau
Almaty
Education
25
Construction of a factory of household appliances in Zhambyl region
Zhambyl region
Mechanical engineering
26
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Shymkent
Medicine
27
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Karaganda region
Energy
28
Construction of a longitudinally welded pipes plant
Astana
Manufacture of construction materials
29
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Turkistan region
Tourism
30
Construction of a new hydrogen production plant for the Pavlodar petrochemical plant
Pavlodar region
Petrochemistry and oil refining
31
Construction of a plant for the production of direct reduction iron with a capacity of 200 tons/year
Karaganda region
Metallurgical industry
32
Financing of capital investments in order to increase production capacity and replenishment of working capital
Pavlodar region
Metallurgical industry
33
Construction of a gold recovery plant with a capacity of 1.2 million tons per year on the basis of the Aktas-I and Aktas-II deposits
Karaganda region
Metallurgical industry
34
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Aktobe region
Metallurgical industry
35
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Turkistan region
Transport infrastructure
36
Modernisation of the 220.95 MW wind farm in Akmola region
Akmola region
Energy
37
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Almaty region
Manufacture of construction materials
38
Industrial Logistics Hub in Almaty region
Almaty
Transportation and warehousing
39
Comprehensive reconstruction of Karaganda International Airport
Karaganda region
Transport infrastructure
40
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Karaganda region
Metallurgical industry
41
Construction and operation of a full-cycle automobile plant for the production of vehicles
Almaty
Mechanical engineering
42
Organization of the Atyrau Carriage Building Company's activities for the production of freight railcars
Atyrau region
Mechanical engineering
43
Construction of a heavy machinery plant in Atyrau region
Atyrau region
Mechanical engineering
44
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Zhambyl region
Chemical industry
45
Acquisition of equipment for the Data Center for 200 racks in Astana
Astana
Information and communication
46
Construction of the highway «Rudny city bypass» in Kostanay region, length of 17 km
Kostanay region
Construction, reconstruction, repair, toll traffic and maintenance of highways
47
Repair of highways of republican importance
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
48
Plant for the production of ceramic products in Karaganda, Karaganda region
Karaganda region
Manufacture of construction materials
49
Construction of an international hospital with 200 beds in Almaty
Almaty
Healthcare
50
Construction and commissioning of the Mining HPP-1 (19 MW) and HPP-2 (23 MW)
Zhetysu region
Energy
51
Construction of a 340 MW renewable power plant in the Southern Zone
Turkistan region
Energy
52
Construction of the Balkhash solar power plant with a capacity of 30 MW
Karaganda region
Energy
53
Organization of production of mechanical processing of metal products
Pavlodar region
Mechanical engineering
54
Construction of an Alkylate production plant
Pavlodar region
Petrochemistry and oil refining
55
Construction of a Gas Chemical Complex for Methanol Production With a Capacity of 130 Thous Tons
West Kazakhstan region
Petrochemistry and oil refining
56
Production of PET molds for the food sector
Almaty
Petrochemistry and oil refining
57
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project «Purchase of 157 passenger cars»
Interregional project
Transport, logistics, communications
58
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project «Purchase of platform car»
Interregional project
Transport, logistics, communications
59
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project «Acquisition of 3 electric train sets»
Interregional project
Transport, logistics, communications
TOTAL:
118 160
Construction of a poultry farm with a capacity of 12,500 tons of poultry meat per year in Zerendinsky district of Akmola region of the Republic of Kazakhstan
Borrower
Canadian Chicken Limited PC
Beneficiaries
Khalisha Savchuk, Tatyana Moiseyenko
Region
Akmola region
Industry
Agricultural sector
Application status
The «Banking expertise» stage has been completed
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Borrower
AltynAlmas Reagents LLP
Beneficiaries
Igor Vetiul, Bakhrom Burkhonovich Jalolov, Vladimir Viktorovich Jumanbayev, Diyar Bakhytbekovich Kanashev, Kairat Karibayevich Rakhishov, Gouden Reserves B.V.
Region
Zhambyl region
Industry
Chemical industry
Application status
At the stage of Banking expertise
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Borrower
AralSoda LLP
Beneficiaries
Dauren Mukashev
Region
Kyzylorda region
Industry
Chemical industry
Application status
Collection of documents for stage of Banking expertise
Expansion of production capacity to increase new production lines and replenish working capital for pre-export financing
Borrower
RG Brands Kazakhstan LLP
Beneficiaries
Kairat Mazhibayev
Region
Almaty region
Industry
Food industry
Application status
Approved
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
Borrower
Atameken-Agro Oils LLP
Beneficiaries
Amir Islamov
Region
North Kazakhstan region
Industry
Food industry
Application status
At the stage of Indicative analysis
Vertically Integrated Poultry Farm for Broiler Meat Production, With a Capacity of 24,000 Tons Per Year, in the West Kazakhstan Region
Borrower
A.R.R. LLP SHYNGYRLAU
Beneficiaries
mr. Menahem Shalom (Israel) mr. Mosenson Ysroel (Israel)
Region
West Kazakhstan region
Industry
Food industry
Application status
At the stage of Indicative analysis
Agro-Industrial Complex for Beef Production in Akmola Region
Borrower
Big Farm LTD PC
Beneficiaries
Abu Amirkhan Oralbayuly, Oralbay Askergaliyevich Abuov, Dina Beibitovna Nurpeissova, Mariya Pavlovna Vakhrusheva, Kairat Amangeldiyevich Tassimov
Region
Akmola region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Construction of Meat Processing Complex in Abai Region of the Republic of Kazakhstan, Semipalatinsk Meat Canning Plant
Borrower
Eurasia Agro Semey LLP
Beneficiaries
Kydyrbek Talassov
Region
Abay region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Forming of Dairy Farms for 1,200 heads in Kostanay Region
Borrower
Istithmar Agro LLP
Beneficiaries
Adilzhan Idrisovich Smailov
Region
Kostanay region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Borrower
GPC Investment LLP
Beneficiaries
SI Committee of State Property and Privatization under the Ministry of Finance of the Republic
Region
Atyrau region
Industry
Petrochemistry and oil refining
Application status
Approved
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Borrower
TETHYS AKTAU I LLP
Beneficiaries
mr. Fettah Tamince
Region
Mangystau region
Industry
Tourism
Application status
At the stage of Banking expertise
Construction of a 150 MW Wind Farm (Khromtau-1) in Aktobe Region
Borrower
Kazakhstan Electrolysis Plant JSC
Beneficiaries
Patokh Shodiyev, Mukadaskhan Ibragimova, Alexander Mashkevich, Government of the Republic of Kazakhstan
Collection of documents for the stage of Banking expertise
Construction of a production complex for the production of pumping equipment, pipeline fittings and asynchronous electric motors in the free economic zone «G4City», Konaev, Almaty region
Borrower
Karlskrona LC AB LLP
Beneficiaries
Adayev Rakhmatulla, Akhmetova Galina
Region
Almaty region
Industry
Mechanical engineering
Application status
Collection of documents for the stage of Indicative analysis
Tourist base «Ski & Spa Resort»
Borrower
Sadu Development LLP
Beneficiaries
Saduakas Elmira
Region
Almaty
Industry
Tourism
Application status
At the stage of Banking expertise
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Borrower
Mineral Product International LLP
Beneficiaries
Kan Konstantin Alexandrovich, Kan Sergey Vladimirovich, Ibraeva Marina Leonidovna
Region
Pavlodar region
Industry
Metallurgical industry
Application status
At the stage of Indicative analysis
Expansion of the mining and processing plant for the production of copper and nickel concentrates at the Maksut deposit of the company BAST JSC
Borrower
BAST JSC
Beneficiaries
Turlov Timur
Region
Abay region
Industry
Metallurgical industry
Application status
At the stage of Indicative analysis
Construction of a new gas processing plant
Borrower
Kazakh gas processing plant LLP
Beneficiaries
Government of the Republic of Kazakhstan
Region
Mangystau region
Industry
Petrochemistry and oil refining
Application status
Collection of documents for the stage of Indicative analysis
Organization of production of metallic silicon
Borrower
KAZ-EURO HOLDING LLP
Beneficiaries
Mauleisharafiddinuly Nasyrulla
Region
Ulytau region
Industry
Metallurgical industry
Application status
At the stage of Indicative analysis
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
Borrower
Rich Land Int LLP
Beneficiaries
Biguzin Abdykarim Kairbekovich
Region
East Kazakhstan region
Industry
Metallurgical industry
Application status
At the stage of Indicative analysis
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Borrower
CCP Turkestan LLP
Beneficiaries
Samruk-Kazyna NWF JSC
Region
Turkistan region
Industry
Energy
Application status
Collection of documents for stage of Banking expertise
Reconstruction of Almaty CHP-3
Borrower
Almaty electric stations JSC
Beneficiaries
Samruk-Energo JSC
Region
Almaty
Industry
Energy
Application status
At the stage of Banking expertise
Strengthening the electrical network of the Southern zone of the UES of Kazakhstan. Construction of electrical grid facilities
Borrower
KEGOC JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Interregional project
Industry
Energy
Application status
At the stage of Indicative analysis
Creation of a World-Class Innovative Entrepreneurial University in PIT Alatau
Construction of a factory of household appliances in Zhambyl region
Borrower
Alima DELUX LLP
Beneficiaries
Komekbaeva Aliya Artykbaevna
Region
Zhambyl region
Industry
Mechanical engineering
Application status
Collection of documents for stage of Banking expertise
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Financing of capital investments in order to increase production capacity and replenishment of working capital
Borrower
Kazakhstan Electrolysis Plant JSC
Beneficiaries
Alexander Mashkevich, Patokh Shodiev, Makardaskhan Ibragimova, Government of the Republic of Kazakhstan
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Collection of documents for the stage of Indicative analysis
Construction of a gold recovery plant with a capacity of 1.2 million tons per year on the basis of the Aktas-I and Aktas-II deposits
Borrower
Turan Resources Ltd. PC
Beneficiaries
Shakirimov Alibek Bauyrzhanovich, Syzdykov Daulet Titovich, Kim Alexander Georgievich, Kymbatov Murat Amangeldinovich, Pavlinger Roman Sergeevich
Region
Karaganda region
Industry
Metallurgical industry
Application status
At the stage of Business offer
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Borrower
Ocean Energy Company LLP
Beneficiaries
Ontustik Financial Commercial and Industrial Corporation LLP (Seitzhanov family), EAST INDUSTRY COMPANY Ltd LLP (Bazarbekuly Baglan and Kozhabekov Nurlan Bazarbekovich)
Region
Turkistan region
Industry
Transport infrastructure
Application status
At the stage of Indicative analysis
Modernisation of the 220.95 MW wind farm in Akmola region
Borrower
Jasil Jel Energy LLP, «Borey Energo» LLP, «Energo Trust» LLP, Sofiyevskaya Wind Power Plant LLP, Arkalyk Wind Power Plant LLP
Beneficiaries
«CPIH Netherlands B.V.» company, «Sao Simao Investment Limited» company, China Power International Holding Ltd. (China) – State Power Investment Corporation Limited (beneficial shareholder of СPIH)
Region
Akmola region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Borrower
«Altyn Taga» LLP
Beneficiaries
Yeltezerova Aisha Sarsenbayevna
Region
Almaty region
Industry
Manufacture of construction materials
Application status
Collection of documents for the stage of Banking expertise
Industrial Logistics Hub in Almaty region
Borrower
G-Trans JSC
Beneficiaries
Akhsambiev Talgat Abdykaimovich, Nauruzbaev Maksat Sabyrovich
Region
Almaty
Industry
Transportation and warehousing
Application status
Collection of documents for the stage of Indicative analysis
Comprehensive reconstruction of Karaganda International Airport